Project Atlas Data Center Campus (South Whitehall Township)
CDE Acquisitions, LLC · South Whitehall Township, PA · United States
Facility record
- Lifecycle
- ProposedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- 2747 North Cedar Crest Boulevard
- Coordinates
- 40.6400848, -75.5443246
- Serving utility, source-reported
- PPL
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- Not published
- Source record updated
- 2026-09-25
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Proposed
Revised plan scheduled for a South Whitehall Township public hearing on June 11, 2026, after the developer cut the program from six buildings to three data center buildings plus support structures.
Underlying source
Source notes
Three parcels at 2493, 2807 and 2747 N. Cedar Crest Boulevard totalling 410 acres across from Parkland High School, owned by Jeras Corporation, with CDE Acquisitions, LLC of Atlanta as applicant. The revised program is three data center buildings of 492,285 sq ft each plus a 40,680 sq ft administration building and a 39,167 sq ft warehouse, 1,556,702 sq ft in total - down from six buildings over 5 million sq ft. Parking drops from 966 to 399 spaces and weekday trips from 3,865 to 1,154. Includes an on-site electrical substation, emergency generators and a private septic field, with a water main extension requested along Ritter Road. Three barns are to be restored and dedicated to the township; a brick house and farmstead would be removed. Stated construction start November 2029, completion April 2030.
Would be served by a new PPL substation.
Sources and provenance
- Plans change for proposed South Whitehall data center; here's what's on the table now · source retrieved 2026-09-12
- Residents push for public hearing as South Whitehall takes new look at hyperscale data center · source retrieved 2026-09-25
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.