SOURCE-LINKED U.S. REGISTRY

Centeris South Hill Campus (SH1/SH2)

Centeris (The Benaroya Company) · Puyallup, WA · United States

Facility record

Lifecycle
OperationalSource-reported lifecycle
Location precision
approximate
Address as listed
1023 39th Avenue SE
Coordinates
47.136, -122.272
Serving utility, source-reported
Not established
Operational capacity, source-reported
Not published
Planned capacity, source-reported
50 MW
Source record updated
2026-09-05

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Operational

    Data Center Frontier reported Colocation Northwest leasing up to 7 MW of IT capacity at the operating South Hill campus.

    Underlying source

Source notes

Two data center buildings — SH1 at 1023 39th Avenue SE and SH2 at 1015 39th Avenue SE, Puyallup — on an 86-acre campus with a dedicated on-site substation rated to 50 MW, expandable in 25 MW increments. SH1 is a 56,000 sq ft LEED Gold facility; a 176,000 sq ft powered shell adjoins it. Colocation Northwest (IsoFusion) leases up to 7 MW. Owned by The Benaroya Company, which entered the data center business in 2010; the site previously housed semiconductor operations. MRSC's August 2026 summary reports 21 full-time employees plus 50-100 third-party vendor employees. Coordinates are an approximate geocode of the SH1 address.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.

Back to map & directory