CENTRA RNO2 (Keystone Data Center)
CENTRA Digital Interconnect · Reno, NV · United States
Facility record
- Lifecycle
- Under constructionSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- 265 Keystone Avenue
- Coordinates
- 39.525542, -119.82612
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- Not published
- Source record updated
- 2026-10-22
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Permitted
Conditional use permit approved by the Reno Planning Commission; no appeals were filed.
Underlying source - Under construction
Building permit issued after the 2025-09-11 geotechnical approval; more than 30 soils/compaction inspections during footing work, extended-hours concrete pours approved for May and June 2026, and the final setback/soil/compaction letter approved in June 2026.
Underlying source
Source notes
CENTRA's own facility page advertises 4.4 MW available in Q4 2026, liquid-cooling-enabled to 150 kW per cabinet, air-cooled chillers and a target PUE of 1.35 or better. Capacity figures in circulation conflict (3 MW ramping to 6.67 MW as presented to the Planning Commission in January 2025, versus 12 MW advertised later), so no capacity is recorded. Site is split-zoned Industrial/General Commercial and not adjacent to residentially zoned land, which is why Reno's residential property-line noise standard does not apply.
Sources and provenance
- Keystone Data Center Frequently Asked Questions (updated 2026-07-28) · source retrieved 2026-09-24
- CENTRA RNO2 — Reno, NV facility page · source retrieved 2026-09-24
- Reno, Nevada data center directory (CENTRA Reno RNO2, 265 Keystone Ave) · source retrieved 2026-09-24
- Memo: Data Centers — Background Information (revised 2026-05-12) · source retrieved 2026-09-24
- Centra completes structural topping out of Reno data center · source retrieved 2026-10-14
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.