Cipher Barber Lake Campus
Cipher Digital · Colorado City, TX · United States
Facility record
- Lifecycle
- Under constructionSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 32.3954, -100.8687
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- 300 MW
- Source record updated
- 2026-10-22
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Under construction
Cipher Mining acquired the 587-acre Barber Lake site near Colorado City for HPC/AI; Phase I targeted Sept 2026 (Fluidstack/Google lease)
Underlying source
Source notes
587-acre Barber Lake site near Colorado City, Mitchell County; ~300 MW HPC/AI under a Fluidstack/Google lease; Phase I targeted Sept 2026. Coordinates are the Colorado City area centroid. Cipher Mining was renamed Cipher Digital.
Sources and provenance
- Cipher Mining acquires more than 500 acres across two sites in Texas for crypto and HPC use · source retrieved 2026-07-07
- Cipher Mining Inc. — Proposed $1.4B Senior Secured Notes Offering press release (SEC 8-K exhibit, via Quiver Quantitative reproduction) · source retrieved 2026-07-25
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.