Cipher Mikeska HPC Data Center
Cipher Digital · Brady, TX · United States
Facility record
- Lifecycle
- ProposedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 31.1317, -99.3349
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- Not published
- Source record updated
- 2026-07-17
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- ProposedUnderlying source
Source notes
Cipher's Mikeska HPC/AI data center site, in West Texas outside Brady (McCulloch County). Targeted capacity up to 500 MW; estimated energization 2027-2028. Cipher exercised its option to acquire the ground lease/purchase rights in February 2026. Part of Cipher's ~3.4 GW / 8-site HPC pipeline (Cipher Digital, formerly Cipher Mining). Coordinates approximate (Brady, TX geocode). Cipher Mining was renamed Cipher Digital.
Sources and provenance
- Cipher Digital (Cipher Mining) FY2025 Form 10-K — Mikeska Site, West Texas, targeted capacity up to 500 MW, energize 2028; option to purchase exercised Feb 2026 · source retrieved 2026-07-17
- Baxtel — Cipher Mikeska data center (500 MW, outside Brady, Texas) · source retrieved 2026-07-17
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.