SOURCE-LINKED U.S. REGISTRY

Cipher Mikeska HPC Data Center

Cipher Digital · Brady, TX · United States

Facility record

Lifecycle
ProposedSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
31.1317, -99.3349
Serving utility, source-reported
Not established
Operational capacity, source-reported
Not published
Planned capacity, source-reported
Not published
Source record updated
2026-07-17

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Proposed

    Underlying source

Source notes

Cipher's Mikeska HPC/AI data center site, in West Texas outside Brady (McCulloch County). Targeted capacity up to 500 MW; estimated energization 2027-2028. Cipher exercised its option to acquire the ground lease/purchase rights in February 2026. Part of Cipher's ~3.4 GW / 8-site HPC pipeline (Cipher Digital, formerly Cipher Mining). Coordinates approximate (Brady, TX geocode). Cipher Mining was renamed Cipher Digital.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.

Back to map & directory