Cipher Milsing HPC Data Center
Cipher Digital · Huntsville, TX · United States
Facility record
- Lifecycle
- ProposedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 30.7235, -95.5508
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- Not published
- Source record updated
- 2026-07-26
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- ProposedUnderlying source
Source notes
Cipher's Milsing HPC/AI data center site near Huntsville, Texas (Walker County, northeast of Houston); ~187 acres. Targeted capacity up to 500 MW; estimated energization 2028-2029 (aggregators list a 2027 target). Cipher entered an option agreement in October 2024 and exercised the option in December 2025. Part of Cipher's ~3.4 GW / 8-site HPC pipeline (Cipher Digital, formerly Cipher Mining). Coordinates approximate (Huntsville, TX geocode). Cipher Mining was renamed Cipher Digital.
Sources and provenance
- Cipher Digital (Cipher Mining) FY2025 Form 10-K — Milsing Site, East Texas, targeted capacity up to 500 MW, energize 2028-2029; option exercised Dec 2025 · source retrieved 2026-07-17
- Baxtel — Cipher Milsing data center (~187 acres, Huntsville, Texas, outside Houston) · source retrieved 2026-07-17
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.