SOURCE-LINKED U.S. REGISTRY

Sheridan Data Center (Clean Cloud Energy, Grant County)

Clean Cloud Energy (Sheridan Data Center LLC) · Sheridan, AR · United States

Facility record

Lifecycle
ProposedSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
34.3100971, -92.4013484
Serving utility, source-reported
Arkansas Electric Cooperative Corp. / C&L Electric Cooperative
Operational capacity, source-reported
Not published
Planned capacity, source-reported
800 MW
Source record updated
2026-10-18

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Proposed

    Quorum Court passed a resolution of intent on a data center tax abatement. EdgeConneX signed an LOI in June 2026 as a possible buyer, not a completed sale.

    Underlying source

Source notes

753-acre site outside Sheridan. Estimated cost is $8-12B (range only, so no investment figure is recorded). EdgeConneX is in due diligence as a potential buyer. Coordinates are the Sheridan town centroid.

Clean Cloud first planned 500 MW. That rose to 800 MW after AECC located additional power providers.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.

Back to map & directory