CleanSpark Austin County AI Data Center Campus
CleanSpark, Inc. · , TX · United States
Facility record
- Lifecycle
- ProposedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 29.9508, -96.2661
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- 285 MW
- Source record updated
- 2026-08-25
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Proposed
CleanSpark executed 285 MW of long-term power supply agreements (a 28% increase to contracted power) for a ~271-acre AI/HPC data center campus in Austin County; substation construction underway, site design/vertical construction not yet started.
Underlying source
Source notes
First of CleanSpark's two announced Greater Houston-area sites (see also the separate Brazoria County campus). No city/address disclosed anywhere in the filing — company language is only 'positioned between Houston and Austin'; Austin County (seat Bellville) fits that framing, so coordinates are an approximate county reference point, not a parcel. Targeting energization of >200 MW in H1 2027. Explicitly framed by named CleanSpark executives (CBO, SVP of AI Data Centers) as an AI/HPC campus, not continued bitcoin mining or generic cloud — clears the tracker's evidence bar for an AI classification. Combined with the separate Brazoria County campus, CleanSpark cites 'more than 890 MW of aggregate potential utility capacity' in the greater Houston area.
Sources and provenance
- CleanSpark, Inc. Form 8-K, filed 2025-10-29 (Item 8.01) · source retrieved 2026-08-02
- CleanSpark Exhibit 99.1 press release: AI Data Center in Greater Houston · source retrieved 2026-08-02
- CleanSpark Enters Texas Market with Land and Large-Scale Power Acquisition to Rapidly Deploy an AI Data Center in Greater Houston · source retrieved 2026-08-25
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.