CleanSpark Brazoria County (Second Texas) Campus

CleanSpark, Inc. · , TX · United States

Facility record

Lifecycle
ProposedSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
29.1694, -95.431
Serving utility, source-reported
Not established
Operational capacity, source-reported
Not published
Planned capacity, source-reported
300 MW
Source record updated
2026-10-30

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Proposed

    CleanSpark announced acquisition of up to 447 acres in Brazoria County with 300 MW (expandable to 600 MW) of ERCOT-approved interconnection capacity for a second Texas AI/HPC campus near Houston.

    Underlying source
  2. Proposed

    CleanSpark's February 2026 operational update confirms the acquisition closed, adding '300 megawatts of ERCOT-approved capacity.' No construction-start evidence found; site remains staged as proposed.

    Underlying source

Source notes

CleanSpark's second announced Houston-area AI/HPC campus (see also the separate Austin County campus, ~890 MW aggregate potential combined). No city or street address is disclosed in any source found as of August 2026; the coordinates are an approximate reference point at the Brazoria County seat (Angleton, TX), not a parcel location. 447 acres is disclosed as an 'up to' ceiling. An additional 300 MW (to a 600 MW total) is described as a potential future expansion, not yet ERCOT-approved or contracted. No named AI/HPC tenant or GPU lease is disclosed for this specific site (unlike CleanSpark's Sandersville, GA site), so the AI classification is likely rather than confirmed. As of August 2026, no raw SEC 8-K had been located for this transaction; it is sourced to CleanSpark's own press release and investor-relations pages, independently corroborated by trade press (DataCenterDynamics, The Energy Mag). Katten (March 2026) describes the acquisition of approximately 155 acres, with rights to acquire an additional adjacent approximate 437 acres.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.

Back to map & directory