Project Cherry Blossom
Cloverleaf Infrastructure · Frenchtown Township, MI · United States
Facility record
- Lifecycle
- ProposedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 41.988, -83.386
- Serving utility, source-reported
- DTE Energy
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- Not published
- Source record updated
- 2026-09-09
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
No dated operational history is established in this record. Publication, discovery and source-update dates are not opening dates.
Source notes
Proposed on the former ProMedica Hospital site off I-75 and North Dixie Highway, Frenchtown Township; site is zoned Planned Unit Development, allowing industrial use. ~200 acres; preliminary plans include a pedestrian/bike path and landscaped berms/tree buffers along North Dixie Highway. Cloverleaf's own FAQ describes it as still 'in the development phase' with a taxable investment of 'more than $1B' but does not disclose a MW capacity figure. As of October 2026, Cloverleaf was already tracked elsewhere (AL, GA, IL, KS, MO, OK, WI) as a data-center developer. Note: Cloverleaf's own FAQ page refers to the project once as 'Project Ironwood' -- unclear whether this is the same project under an earlier working name or a distinct nearby Cloverleaf site (a 'Project Ironwood' near Dundee/Milan Townships in the same county has been reported separately elsewhere); treated as one record pending disambiguation. Coordinates are an approximate Frenchtown Township / former-hospital-site estimate, not parcel-geocoded. The developer states publicly that the site's available power has not yet been determined, so no MW capacity figure exists to record.
Sources and provenance
- FAQs - Project Cherry Blossom · source retrieved 2026-09-09
- Project Cherry Blossom - home · source retrieved 2026-08-08
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.