Cloverleaf Project Open Sky
Cloverleaf Infrastructure · Piedmont, OK · United States
Facility record
- Lifecycle
- ProposedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 35.7, -97.8
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- Not published
- Source record updated
- 2026-10-28
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
No dated operational history is established in this record. Publication, discovery and source-update dates are not opening dates.
Source notes
630-acre proposed data campus near the Mathewson Substation, NW 248th Street, Piedmont (Canadian/Kingfisher county line) — part of a transmission corridor drawing multiple competing proposals; see the Beltline Energy Piedmont Site, a separate, distinct 321-acre site nearby — do not conflate despite both being in Piedmont. Closed-loop cooling planned. Cloverleaf recently withdrew from two Wisconsin data center projects after local opposition (context, not this project). Radio Oklahoma News, citing information provided to the city, reported that the project represents a $1 billion investment, which is the figure recorded. Job and capacity figures are not recorded because the sources give ceilings or disagree: Cloverleaf's chief development officer told the planning commission the project would create "up to 300 jobs, with potentially a thousand more during construction" (KOKH FOX 25), while Radio Oklahoma News reported "up to 500 permanent jobs" and "up to 1.4 gigawatts of electricity", and KOKH FOX 25 reported that the campus "would require 1.5 gigawatts of power".
Sources and provenance
- Powered land company Cloverleaf proposing 633-acre data center in Canadian County, Oklahoma · source retrieved 2026-08-06
- Piedmont planning commission encourages city council to deny data center proposal · source retrieved 2026-07-11
- A Transmission Line Built to Fix Grid Congestion Has Become Oklahoma's Hottest Data Center Address · source retrieved 2026-07-11
- Cloverleaf Piedmont Campus (Project Open Sky) — Data Center Tracker · source retrieved 2026-08-06
- Commission urges council to deny Cloverleaf plan; Beltline Energy vote delayed for review · source retrieved 2026-09-14
- Piedmont Data Center Proposal Heads To City Council Vote Tonight · source retrieved 2026-09-14
- 'You've dragged your feet': Piedmont delays data center vote for fifth time · source retrieved 2026-10-28