SOURCE-LINKED U.S. REGISTRY

Cloverleaf Project Open Sky

Cloverleaf Infrastructure · Piedmont, OK · United States

Facility record

Lifecycle
ProposedSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
35.7, -97.8
Serving utility, source-reported
Not established
Operational capacity, source-reported
Not published
Planned capacity, source-reported
Not published
Source record updated
2026-10-28

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

No dated operational history is established in this record. Publication, discovery and source-update dates are not opening dates.

Source notes

630-acre proposed data campus near the Mathewson Substation, NW 248th Street, Piedmont (Canadian/Kingfisher county line) — part of a transmission corridor drawing multiple competing proposals; see the Beltline Energy Piedmont Site, a separate, distinct 321-acre site nearby — do not conflate despite both being in Piedmont. Closed-loop cooling planned. Cloverleaf recently withdrew from two Wisconsin data center projects after local opposition (context, not this project). Radio Oklahoma News, citing information provided to the city, reported that the project represents a $1 billion investment, which is the figure recorded. Job and capacity figures are not recorded because the sources give ceilings or disagree: Cloverleaf's chief development officer told the planning commission the project would create "up to 300 jobs, with potentially a thousand more during construction" (KOKH FOX 25), while Radio Oklahoma News reported "up to 500 permanent jobs" and "up to 1.4 gigawatts of electricity", and KOKH FOX 25 reported that the campus "would require 1.5 gigawatts of power".

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.

Back to map & directory