Cloverleaf Infrastructure (applicant Piedmont DevCo LLC), with Pumpkin Center Properties / the Prather Company · Harlem, GA · United States
Facility record
- Lifecycle
- PermittedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 33.4145834, -82.3126237
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- Not published
- Source record updated
- 2026-09-23
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Proposed
Rezoning application filed to convert four parcels from Planned Unit Development to Data Center (D-C) district.
Underlying source - Permitted
Columbia County commissioners approved the rezoning.
Underlying source
Source notes
Four data center buildings exceeding 717,000 sq ft each, two 180,000 sq ft warehouses, office space, an on-site electrical substation and stormwater ponds on roughly 420 acres along I-20 and Appling Harlem Road. Permanent employment is reported as a 200–300 range, so no single figure is recorded. Zoning approval is the first of several steps: site/building plans, a land-disturbance application and a Georgia Power letter confirming it can serve the load are still outstanding. Distinct from White Oak Technology Park in Appling, which Columbia County approved the same night. Coordinates are the Harlem city centroid (OSM Nominatim), not a parcel.
Sources and provenance
- Data center project proposed along Appling Harlem Road · source retrieved 2026-09-23
- Columbia Co. data centers get zoning approval, face additional steps before construction · source retrieved 2026-09-23
- Cloverleaf: Pumpkin Tech Campus Data Center · source retrieved 2026-09-23