Comanche Circle
Sailfish Digital Ventures (SDV) · Tolar, TX · United States
Facility record
- Lifecycle
- ProposedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 32.35, -97.83
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- Not published
- Source record updated
- 2026-10-22
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
No dated operational history is established in this record. Publication, discovery and source-update dates are not opening dates.
Source notes
Near Vistra's Comanche Peak Nuclear Plant. Developer states a 5GW total pipeline across 9 campuses; a later, scaled-back figure puts Comanche Circle plus two smaller Sailfish projects combined at 'up to 3 gigawatts' - given conflicting figures, no single capacity figure is recorded here. Conditional county approval Jan 2026; construction targeted late 2026. No hyperscaler tenant confirmed - speculative developer-led land assembly. Coordinates are approximate.
Sailfish Investors' Comanche Circle (2,100-2,600 acre, up to 5GW planned across nine campuses) originally planned a mixed gas + grid supply, anchored by a proposed 2GW on-site gas plant ('Tolar Power Center') developed by NRG that would have supplied the campus.
Sources and provenance
- Sailfish plans multi-gigawatt data center park outside DFW, Texas · source retrieved 2026-07-09
- Hood County rejects data center development pause · source retrieved 2026-07-09
- KERA News: NRG withdraws permit for proposed Tolar gas plant amid community opposition (confirms June 18 2026 withdrawal, campus power plan now undefined) · source retrieved 2026-08-16
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.