Compass Datacenters Goodyear Campus
Compass Datacenters · Goodyear, AZ · United States
Facility record
- Lifecycle
- OperationalSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 33.4354446, -112.3756856
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- 72 MW
- Planned capacity, source-reported
- 350 MW
- Source record updated
- 2026-09-10
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Operational
Compass announced construction start on the first two data centers (72 MW combined IT load), with completion projected for Q4 2019.
Underlying source
Source notes
225-acre campus at the northwest corner of Bullard Avenue and Yuma Road in Goodyear; eight data centers and over 1.8 million sq ft at full build-out, capable of 350 MW, with a 144 MW first master-plan series and a 72 MW opening phase. Distinct from the tracked Vantage Phoenix (Goodyear), Stream PHXA (Goodyear) and Microsoft Goodyear campuses — different operator and different parcel. Coordinates are the cited Bullard Avenue / Yuma Road intersection from OpenStreetMap; the campus lies to the northwest, so the pin is approximate.
On-site 230 kV substation.
Sources and provenance
- Compass Datacenters Begins Construction of First Two Data Centers on Phoenix Campus · source retrieved 2026-09-10
- Compass Datacenters will build 225-acre Goodyear campus · source retrieved 2026-09-10
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.