Core Scientific Denton Data Center (Denton 1)
Core Scientific · Denton, TX · United States
Facility record
- Lifecycle
- Under constructionSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 33.1932, -97.1276
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- 260 MW
- Source record updated
- 2026-08-16
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Under construction
Converted bitcoin-mining campus (8171 Jim Christal Rd) being rebuilt into a CoreWeave AI/HPC hub; renovation began Nov 2024, phased buildout continuing; full critical IT load reaches ~260MW after the Feb 2025 70MW expansion, with other coverage citing a 2027 full-site launch target.
Underlying source
Source notes
Sources and provenance
- Core Scientific and CoreWeave Announce $1.2 Billion Expansion at Denton, TX Site · source retrieved 2026-08-03
- Core Scientific: Denton, TX Data Center · source retrieved 2026-08-03
- Denton, TX Data Center | High-Density at Scale · source retrieved 2026-08-16
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.