Core Scientific Muskogee Campus
Core Scientific · Muskogee, OK · United States
Facility record
- Lifecycle
- Under constructionSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- 1525 West 43rd Street South
- Coordinates
- 35.72, -95.42
- Serving utility, source-reported
- OG&E (Oklahoma Gas & Electric)
- Operational capacity, source-reported
- 70 MW
- Planned capacity, source-reported
- 1000 MW
- Source record updated
- 2026-10-22
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Operational
Initial 100MW (70MW critical IT) phase delivered Q2 2026.
Underlying source - Under construction
Second 82.5MW building under construction; expansion plan targets ~1.5GW gross power (~1.0GW leasable), including a pending acquisition of Polaris DS LLC (440MW OG&E contract).
Underlying source
Source notes
1525 W Smith Ferry Rd, Port Muskogee Industrial Park. Distinct from the existing tracked Google Muskogee County campuses - same county, different developer/site. Coordinates are approximate. CoreWeave is the anchor customer.
Grid power via OG&E is the defining arrangement. Core Scientific's Muskogee campus (the 100MW CoreWeave-anchor HPC facility, ~70MW critical IT load) and the adjacent Polaris DS acquisition are both served by OG&E electric service agreements totaling up to 440MW gross power under contract.
Sources and provenance
- Core Scientific Plans Expansion to 1.5 Gigawatts of Gross Power at Muskogee, Oklahoma Campus · source retrieved 2026-09-10
- Core Scientific and Port Muskogee Break Ground on 100 MW HPC Data Center (investor press release) · source retrieved 2026-07-24
- Core Scientific Plans Expansion to 1.5 Gigawatts of Gross Power at Muskogee, Oklahoma Campus · source retrieved 2026-08-06
- Core Scientific announces 440 MW expansion at Oklahoma site · source retrieved 2026-08-06
- Oklahoma Data Center | High-Density in Muskogee · source retrieved 2026-09-14