- Lifecycle
- Under constructionSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 31.44, -103.58
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- Not published
- Source record updated
- 2026-10-28
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Under construction
Core Scientific announced expansion of its Pecos campus toward ~1.5 GW gross power; first data hall reached interior-footing milestone, first capacity expected early 2027
Underlying source
Source notes
High-density AI/HPC colocation. ~1.5 GW gross / ~1.0 GW leasable is an expansion ceiling (in notes). Co-located in Reeves County with Microsoft's separate 'Project Kirby' Pecos campus (distinct operator/parcel; tracked separately as of July 2026). Address on record: 1939 FM 2119. Core Scientific historically a bitcoin miner, repositioned to HDC. Coordinates are the Pecos area centroid. No Pecos-specific capex is disclosed (Q4 FY2025 capex of $279.2M is company-wide; the $226.2M CoreWeave-funded portion is contract revenue, not capex) -> no investment figure is recorded. No Reeves County abatement attributable to Core Scientific was found (the 'Pecos Power Plant LLC' abatement is a separate gas-plant entity).
Served by the ERCOT grid; Texas-New Mexico Power (TNMP) is the regional distribution utility for Pecos but Core Scientific's filings do not name it. Core Scientific announced a 'scalable behind-the-meter' power solution on 200+ acres (April 2026) with generation type/MW undisclosed - distinct from Microsoft's separate Project Kirby and the Chevron/Energy Forge One gas plant in the same county.
Sources and provenance
- Core Scientific plans expansion to 1.5 gigawatts of gross power at Pecos, Texas campus · source retrieved 2026-07-08
- Core Scientific announces Q4 FY2025 results · source retrieved 2026-07-08