Crane PDX02
Crane Data Centers · Forest Grove, OR · United States
Facility record
- Lifecycle
- Under constructionSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 45.51904, -123.11106
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- 48 MW
- Source record updated
- 2026-09-21
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
No dated operational history is established in this record. Publication, discovery and source-update dates are not opening dates.
Source notes
Public-reception check (2026-09-10): Checked Crane Data Centers' own project page (2026-09-10); it contains only technical specifications and facility features. No public hearing, resident reaction, or official statement of support/opposition documented in this source.
Crane states the Portland Metro campus is 'powered by low cost, renewable energy, utilizing sources like wind and solar', with a design target of 1.3 PUE at full IT capacity and 667+ watts/ft2 high-density cooling.
Sources and provenance
- Crane Data Centers — Oregon (Portland Metro campus, Forest Grove): 'PDX02: ~48 MW and ~150,000 sf'; campus combined capacity 100+ MW; 'Q3 2026 ready for service'. PDX01 Phase 1 and Phase 2 are each listed separately at 24 MW / 36,000 sf white space · source retrieved 2026-09-21
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.