Crow Holdings Stemmons Corridor Data Center Campus
Crow Holdings (developed and leased by CleanArc Data Centers) · Dallas, TX · United States
Facility record
- Lifecycle
- ProposedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 32.7762719, -96.7968559
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- 245 MW
- Source record updated
- 2026-08-26
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Proposed
Crow Holdings announced the 245 MW campus; CleanArc named as development and leasing lead in February 2026.
Underlying source
Source notes
Roughly 40 acres along the Stemmons Corridor that Crow Holdings has owned for decades, currently vacant. First building is 70 MW with delivery targeted for late 2027. The exact parcel address is not disclosed in the announcement, so coordinates are a Dallas city-level geocode rather than a parcel point.
Planned dedicated on-site substation sized to support the full 245 MW campus; long-lead equipment procurement and substation planning reported in process.
Sources and provenance
- Crow Holdings Announces 245MW Flagship Data Center Campus in Central Dallas · source retrieved 2026-08-26
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.