Crusoe Hallam Data Center (Monolith Olive Creek campus)
Crusoe · Hallam, NE · United States
Facility record
- Lifecycle
- PermittedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 40.5485515, -96.782795
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- 35 MW
- Source record updated
- 2026-10-30
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Proposed
Monolith announced plans for a data center on its Olive Creek campus with Crusoe as the prospective partner; it sought a Hallam zoning amendment to add 'data center' as an authorized use.
Underlying source - Permitted
Hallam Village Board approved zoning rights for the data center.
Underlying source
Source notes
Phase 1 is modular, shipping-container-sized buildings on about 10 acres in the northeast part of Monolith's Olive Creek carbon-black campus (I-2 Heavy Industrial), 35 MW, 15 jobs. A larger Phase 2 parcel east of the campus would need a separate approval. Crusoe Technologies is named as the data center developer; Monolith signed a special permit with Crusoe in July 2026. No construction timeline has been released. This is distinct from the Sagebrush Hallam hyperscale campus and from NPPD's Sheldon and Princeton Road stations. Coordinates are the Monolith Olive Creek plant point from OSM, not the 10-acre parcel.
Sources and provenance
- Monolith seeks to build data center in Hallam, application to be submitted by mid-July · source retrieved 2026-10-12
- Hallam residents question Monolith data center proposal at packed town hall · source retrieved 2026-10-12
- Hallam Village Board approves zoning rights for data center · source retrieved 2026-10-12
- OpenStreetMap: Monolith Olive Creek 1, Hallam · source retrieved 2026-10-12
- Hallam Village Board unanimously approves Monolith data center · source retrieved 2026-10-30
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.