Crusoe Nolan County Data Center

Crusoe Energy Systems · Sweetwater, TX · United States

Facility record

Lifecycle
ProposedSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
32.4709519, -100.405938
Serving utility, source-reported
Not established
Operational capacity, source-reported
Not published
Planned capacity, source-reported
Not published
Source record updated
2026-10-28

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Proposed

    Nolan County commissioners approved a 10-year tax abatement for the project.

    Underlying source

Source notes

Reported to generate more than $3m annually in payments in lieu of taxes plus more than $2m annually in charitable contributions to Nolan County. No investment figure is recorded here: KTXS reports $7 billion without attributing the figure; as of October 2026 no other source found gives a figure. KTXS also reports a 200-megawatt facility without attributing the figure, so no planned capacity is recorded, and quotes a county commissioner estimating roughly 2,000 workers on site during construction; that estimate is not recorded as a jobs figure. Distinct from IREN's Sweetwater campus, which is a different operator on a different site in the same county. Coordinates are a city-level geocode.

A Nolan County commissioner states the data center will provide its own electricity and should not draw on residential supply; the generation type is not identified in the source.