SOURCE-LINKED U.S. REGISTRY

CyrusOne DFW3-DFW5 (Allen)

CyrusOne · Allen, TX · United States

Facility record

Lifecycle
OperationalSource-reported lifecycle
Location precision
exact
Address as listed
Not published
Coordinates
33.1385206, -96.6599516
Serving utility, source-reported
Oncor
Operational capacity, source-reported
77 MW
Planned capacity, source-reported
50 MW
Source record updated
2026-09-21

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

No dated operational history is established in this record. Publication, discovery and source-update dates are not opening dates.

Source notes

Confirmed 90-acre, 3-building, 50MW campus at Allen, TX (largest DC development in the state per operator page). AI/HPC (likely): Allen campus marketed for AI training, HPC, multi-cloud.

CyrusOne signed a 40MW wind+solar PPA with Gexa Energy (announced April 2022) explicitly covering its North Texas data centers, naming Allen, Carrollton, and Lewisville as the sites the purchase powers.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.

Back to map & directory