SOURCE-LINKED U.S. REGISTRY

CyrusOne Freestone Energy Center Campus

CyrusOne · Fairfield, TX · United States

Facility record

Lifecycle
Under constructionSource-reported lifecycle
Location precision
approximate
Address as listed
1366 FM488
Coordinates
31.7285, -96.1611
Serving utility, source-reported
Not established
Operational capacity, source-reported
Not published
Planned capacity, source-reported
760 MW
Source record updated
2026-08-26

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

No dated operational history is established in this record. Publication, discovery and source-update dates are not opening dates.

Source notes

Phase 1 (380MW) is under construction adjacent to Calpine's Freestone Energy Center at 1366 FM488, Fairfield, targeted operational Q4 2026; Calpine holds an exclusive agreement to also supply Phase 2 (an additional 380MW, planned total 760MW). Not previously tracked -- no existing Freestone County entries.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.

Back to map & directory