CyrusOne Jack County Data Center

CyrusOne (C1 Jack 1 LLC) · , TX · United States

Facility record

Lifecycle
ProposedSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
33.2187858, -98.1580978
Serving utility, source-reported
Not established
Operational capacity, source-reported
Not published
Planned capacity, source-reported
144 MW
Source record updated
2026-10-14

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Proposed

    Phase I: two data centers, minimum 144 MW IT, over $600M in construction value; completion indicated for 2029-2030, pending the Jack County Commissioners Court review.

    Underlying source

Source notes

The site is in southeastern Jack County next to the Vistra power plant. Coordinates are the Jacksboro county-seat point, used as a representative location, not the parcel. Local press reported the county was weighing a reinvestment zone and abatement, but no final vote was found.

Initially on-site natural gas generation with Tier 4 emissions controls, permitted by TCEQ. CyrusOne expects to connect to the existing high-voltage transmission corridor in 2029 or later. The site is adjacent to the existing Vistra power plant in southeastern Jack County.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.