SOURCE-LINKED U.S. REGISTRY

CyrusOne NYM1 (Somerset)

CyrusOne · Somerset, NJ · United States

Facility record

Lifecycle
OperationalSource-reported lifecycle
Location precision
exact
Address as listed
800 Cottontail Lane
Coordinates
40.5379623, -74.5457225
Serving utility, source-reported
PSE&G
Operational capacity, source-reported
30 MW
Planned capacity, source-reported
Not published
Source record updated
2026-10-09

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

No dated operational history is established in this record. Publication, discovery and source-update dates are not opening dates.

Source notes

Confirmed (July 2026) via a web search listing that links directly to the operator's own Somerset NJ: NYM1 page. AI/HPC (likely): Named as an Intelliscale AI-infrastructure-available site.

NYM1 connects to the standard PSE&G grid. No site-specific renewable PPA or on-site generation found for this campus; CyrusOne's fleet-wide '100% sustainable power' goal is corporate-level, not a defining site story.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.

Back to map & directory