SOURCE-LINKED U.S. REGISTRY

CyrusOne NYM2 (Totowa)

CyrusOne · Totowa, NJ · United States

Facility record

Lifecycle
OperationalSource-reported lifecycle
Location precision
exact
Address as listed
50 Madison Road
Coordinates
40.9072095, -74.2422211
Serving utility, source-reported
Not established
Operational capacity, source-reported
6 MW
Planned capacity, source-reported
Not published
Source record updated
2026-10-28

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Operational

    Published as an operating data center on CyrusOne's own Totowa facility page.

    Underlying source

Source notes

200,000 sq ft campus with 50,000 sq ft of data center space on 36-inch raised flooring, 60,000 sq ft of work-area-recovery space, 6 MW total IT capacity and 2,500 tons of N+1 cooling from water-cooled centrifugal chillers. CyrusOne's page lists 53.10% carbon-free or renewable electricity; that reads as a grid-mix statistic rather than a facility procurement claim, so it is not recorded as a renewable-energy percentage. As of September 2026, the heat-rejection method for the chiller plant is not published, so the cooling type is recorded as unknown.

The operator page reports 53.10% carbon-free or renewable electricity and lists 6 MW 'Total IT Capacity' across a 200,000 sq ft, two-building site (50,000 sq ft of data center space).

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.

Back to map & directory