DAMAC Digital Heartland Data Center (Project Heartland)
DAMAC Digital Solutions Kansas LLC · Edgerton, KS · United States
Facility record
- Lifecycle
- PermittedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- 31800 W. 196th St.
- Coordinates
- 38.77374, -94.953635
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- Not published
- Source record updated
- 2026-10-21
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Proposed
Preliminary plat approved; final site plan tabled by Edgerton Planning Commission
Underlying source - Permitted
Planning Commission denial overturned by City Council 2026-07-16; final plat approved by City Council 2026-09-24
Underlying source
Source notes
Conversion of an existing 378,000 sq ft NorthPoint warehouse (built 2016) in Logistics Park Kansas City. The plans include 60 diesel backup generators. DAMAC has not requested tax abatements.
DAMAC funds dedicated electrical infrastructure including an on-site switching station; backup generators permitted via KDHE.
Sources and provenance
- DAMAC Data Center – City of Edgerton · source retrieved 2026-10-21
- Dubai company's $860M data center in Edgerton, KS · source retrieved 2026-10-21
- Edgerton City Council overrides data center development denial · source retrieved 2026-10-21
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.