DartPoints Lexington Data Center Campus

DartPoints · Lexington, KY · United States

Facility record

Lifecycle
ProposedSource-reported lifecycle
Location precision
approximate
Address as listed
745 West New Circle Road
Coordinates
38.0747519, -84.4876212
Serving utility, source-reported
Kentucky Utilities (KU)
Operational capacity, source-reported
Not published
Planned capacity, source-reported
70 MW
Source record updated
2026-09-15

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Proposed

    DartPoints announced the acquisition of a 29.5-acre Lexington data center campus (the former Lexmark property) and plans to redevelop it for AI, neo-cloud, hyperscale and enterprise workloads.

    Underlying source

Source notes

Acquired in May 2026 for $29 million; roughly 343,000 sq ft of campus including about 81,000 sq ft of existing raised-floor data center space, fully zoned for data center use, with rack densities up to 200 kW planned. DartPoints describes a path to approximately 20–30 MW in an initial phase with longer-term expansion potential to 70 MW — the 70 MW build-out figure is the planned capacity recorded here. As of June 2026 the company was still finalizing a ready-for-service date and no operations date had been announced, so this is recorded as proposed rather than operational; Lexington declined to provide city incentives. Coordinates are a geocode of the street address, not a parcel-confirmed footprint.

The property includes an owned on-site substation; DartPoints cites collaboration with Kentucky Utilities and LG&E, and WEKU reports KU supports the project.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.