DataBank Granite Point Campus (SLC2-SLC6)
DataBank · Bluffdale, UT · United States
Facility record
- Lifecycle
- OperationalSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 40.48568, -111.90016
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- 46 MW
- Planned capacity, source-reported
- Not published
- Source record updated
- 2026-11-02
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
No dated operational history is established in this record. Publication, discovery and source-update dates are not opening dates.
Source notes
Subsidies checked at the municipal tier (2026-09-05): no site-level subsidy found. Bluffdale's RDA runs three project areas — Gateway Redevelopment Area and Eastern Bluffdale EDA on the Redwood Road/Bangerter Highway corridor, and Jordan Crossing CRA along the Jordan River near the Utah County border — and DataBank's Granite Point campus on Pony Express Road falls outside all three by street-corridor and section/township/range legal-description cross-reference, not a parcel-level GIS overlay. The Jordan Crossing CRA's own draft plan names four illustrative development sites and none is Granite Point, DataBank, or Pony Express Road; no RDA board minutes or agenda mentions either. DataBank's own marketing blog names only the statewide sales-tax exemption on data-center equipment as an incentive for its Salt Lake-area sites — an entity-level, self-executing state exemption, not a Bluffdale-specific award. Utah's EDTIF programme excludes data centres and the UCA 59-12-104 exemption is self-executing.
Per-building on-site power from DataBank's own campus page: SLC2 10 MW (45,000 sq ft), SLC3 10 MW (53,000 sq ft), SLC4 9 MW (34,000 sq ft), SLC5 20 MW (90,000 sq ft), plus SLC6 at 11 MW available with 'another 11 megawatts to come online in the future' — 60 MW live across the five buildings, with roughly 11 MW of stated headroom at SLC6.
Sources and provenance
- Get to Know DataBank's Salt Lake City Data Centers · source retrieved 2026-08-14
- DataBank Announces Opening of Sixth Salt Lake City Area Data Center · source retrieved 2026-08-14
- Data Center Growth in Utah and the United States — Data Summary, April 2026 (Operating Data Centers in Utah, March 2026) · source retrieved 2026-08-14
- Public notice — Gateway Redevelopment Area boundary amendment (Bluffdale RDA) · source retrieved 2026-09-05
- Jordan Crossing Community Reinvestment Project Area — Draft Plan · source retrieved 2026-09-05
- Tax Incentives Add to Attractiveness of DataBank's Salt Lake Data Centers · source retrieved 2026-09-05
- Kem C. Gardner Policy Institute, Data Center Growth in Utah (April 2026), Operating Data Centers table · source retrieved 2026-11-02
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.