DataBank MCI3 South Lake Campus Data Center
DataBank · Lenexa, KS · United States
Facility record
- Lifecycle
- OperationalSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- 11200 Lakeview Ave
- Coordinates
- 38.925685125075, -94.769520334995
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- 12.75 MW
- Planned capacity, source-reported
- Not published
- Source record updated
- 2026-10-21
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
No dated operational history is established in this record. Publication, discovery and source-update dates are not opening dates.
Source notes
Operator's own site lists this as (MCI3) South Lake Campus Data Center, 69,762 IT sq ft, 12.75MW critical IT load, 15 onsite carriers -- one of two named DataBank facilities in the Kansas City metro (the other is the separate Pine Ridge / Overland Park site, recorded separately). Coordinates are the US Census geocode of the listed street address, retrieved 2026-09-13; precision set to approximate since the parcel/building footprint was not independently confirmed.
Sources and provenance
- Kansas City Data Center and Colocation Solutions · source retrieved 2026-10-21
- DataBank Kansas City MCI3 · source retrieved 2026-10-04
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.