Red Oak Campus
DataBank · Red Oak, TX · United States
Facility record
- Lifecycle
- Under constructionSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 32.5135, -96.7282
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- 480 MW
- Source record updated
- 2026-09-14
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Under construction
$2B loan secured; first building operational before end of 2026.
Underlying source
Source notes
292-acre, 8-building campus. Distinct operator/site from Compass Datacenters' separate Red Oak, TX campus (same town, different companies).
Sources and provenance
- DataBank — $2 billion construction loan for the Dallas-area data center campus · source retrieved 2026-09-14
- Bisnow — DataBank Secures $2B Construction Loan For Red Oak Data Centers · source retrieved 2026-07-25
- DataBank — Red Oak Campus (operator site) · source retrieved 2026-07-25
- Dallas Innovates — DataBank Announces New 480MW North Texas Data Center Campus Featuring Eight Two-Story Data Centers · source retrieved 2026-07-25
- DataBank Secures $2.0B of Construction Financing for First Three Data Centers on New South Dallas Campus · source retrieved 2026-09-08
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.