SOURCE-LINKED U.S. REGISTRY

Red Oak Campus

DataBank · Red Oak, TX · United States

Facility record

Lifecycle
Under constructionSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
32.5135, -96.7282
Serving utility, source-reported
Not established
Operational capacity, source-reported
Not published
Planned capacity, source-reported
480 MW
Source record updated
2026-09-14

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Under construction

    $2B loan secured; first building operational before end of 2026.

    Underlying source

Source notes

292-acre, 8-building campus. Distinct operator/site from Compass Datacenters' separate Red Oak, TX campus (same town, different companies).

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.

Back to map & directory