DC BLOX Atlanta West (ATL1)
DC BLOX · Lithia Springs, GA · United States
Facility record
- Lifecycle
- Under constructionSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 33.7882, -84.6608
- Serving utility, source-reported
- Greystone Power Cooperative
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- 120 MW
- Source record updated
- 2026-10-22
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Proposed
$1.15 billion green loan financing announced; 120 MW campus on 100 acres in Lithia Springs adjacent to Microsoft campus
Underlying source - Under construction
Phase 1 (120 MW Building A) construction underway; delivery targeted 2026
Underlying source
Source notes
Initial 120 MW phase (Building A); site plan includes additional 80 MW Building B (delivery early 2028) and 80 MW Building C (early 2029) totaling 200+ MW. The investment figure reflects green loan construction financing announced August 11, 2025. Located adjacent to Microsoft Douglasville campus, 2.5 miles from Google facility. Coordinates are Lithia Springs area centroid. The original DCD source URL was no longer available as of July 2026 and was replaced with the DC BLOX official press release, which supports all claims. The $98M Douglasville abatement was granted for the campus in the Riverside West Business Park (New River Road); city/authority filings cite 25 permanent jobs (~$130k average) and up to 500 construction jobs over five years — projections, not confirmed headcounts.
Sources and provenance
- DC BLOX Secures $1.15 Billion Green Loan for Atlanta Data Center Campus Development · source retrieved 2026-07-06
- Atlanta West Hyperscale Data Center Campus – DC BLOX official page · source retrieved 2026-07-06
- City approves $98 million tax break for expanded data site · source retrieved 2026-07-07
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.