SOURCE-LINKED U.S. REGISTRY

DC BLOX Montgomery Data Center

DC BLOX · Montgomery, AL · United States

Facility record

Lifecycle
ProposedSource-reported lifecycle
Location precision
approximate
Address as listed
7610 Bill Joseph Pkwy
Coordinates
32.2641207, -86.3728761
Serving utility, source-reported
Not established
Operational capacity, source-reported
Not published
Planned capacity, source-reported
32 MW
Source record updated
2026-10-31

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

No dated operational history is established in this record. Publication, discovery and source-update dates are not opening dates.

Source notes

Announced November 2024 as one of four DC BLOX southeastern hyperscale edge-node sites. Chamber release states verbatim: "$30 million data center investment", "5MW of capacity for a hyperscale anchor tenant, with the potential to scale up to 40MW for additional tenants", "Located in Interstate Industrial Park". Alabama Department of Commerce (Made in Alabama) repeats the 5MW-to-40MW figure. Status is proposed: no cited source states that construction has begun, and DC BLOX's own live location map (checked 2026-09-09) lists only Birmingham and Huntsville in Alabama with no Montgomery entry. An aggregator (servercountry.org) lists this as 40 MW under construction; that is unverified and not cited. The street address 7610 Bill Joseph Pkwy, Hope Hull, AL 36043 is taken from DC BLOX's 2025 campus brochure (Montgomery MGM1, status Planned); WSFA places the site at the Interstate Industrial Park off the Hope Hull exit on Interstate 65. The coordinates are the Nominatim point for Bill Joseph Parkway, a street-level approximation, not a surveyed lot. The brochure's MGM1 block lists "Total SF (Buildable) 80,000 SF", "Available Power 32cMW/48gMW" and "Initial Move-In Contract + 36 months", and WSFA reports the data center is "expected to start being built in June 2025"; no acreage, job count or incentive figures appear in any cited source. Distinct from Meta Montgomery Data Center (different operator and site).

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.

Back to map & directory