DC BLOX North Augusta Hyper Edge Data Center
DC BLOX · North Augusta, SC · United States
Facility record
- Lifecycle
- Under constructionSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 33.4838645, -81.9141182
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- 5 MW
- Source record updated
- 2026-09-22
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Proposed
Announced as one of four Southeastern hyperscale edge-node data centers, 5 MW dedicated to a hyperscale client.
Underlying source - Under construction
Third-party project record reviewed 2026-07-17 lists the North Augusta facility as under construction.
Underlying source
Source notes
Sited along Atomic Road near Jefferson Davis Highway; no street number is given by either source, so the coordinate is an Atomic Road geocode (approximate). The 5 MW is the capacity dedicated to the anchor hyperscale client per DC BLOX's own release. Distinct from the tracked DC BLOX Greenville, Myrtle Beach CLS and Camp Hall records.
Sources and provenance
- DC BLOX to develop four Southeastern hyperscale edge node data centers · source retrieved 2026-09-22
- Server Country — DC BLOX North Augusta Hyper Edge Facility project record · source retrieved 2026-09-22
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.