Deep Green Lansing Data Center

Deep Green · Lansing, MI · United States

Facility record

Lifecycle
CancelledSource-reported lifecycle
Location precision
approximate
Address as listed
Cedar Street and Larch Street
Coordinates
42.747831829239, -84.544559589342
Serving utility, source-reported
Not established
Operational capacity, source-reported
Not published
Planned capacity, source-reported
24 MW
Source record updated
2026-10-28

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Proposed

    Planning commission voted 5-2 to recommend rezoning, reversing its December 2025 rejection.

    Underlying source
  2. Cancelled

    Gander Newsroom's running Michigan data-center tracker records the application as withdrawn in April 2026, after the March planning-commission recommendation.

    Underlying source

Source notes

Downtown Lansing infill project on a 2.5-acre city parking lot at Cedar and Larch Street, developed by U.K.-based Deep Green. Status conflict, resolved in favour of the later source: the Lansing State Journal source (2026-03) shows the planning commission recommending rezoning, but Gander Newsroom's continuously-updated Michigan tracker (retrieved 2026-09-09) lists the application as WITHDRAWN in April 2026, so the record is listed as cancelled. A withdrawn application is not necessarily permanent abandonment. On the March position: as of the source, the planning commission had only RECOMMENDED rezoning to the city council; no council rezoning or site-plan approval is recorded. The buy-sell agreement gives the city a right to buy the land back if the project does not proceed within two years. As of October 2026, the Lansing State Journal source states no investment figure, job counts, or incentive agreement, and the Gander tracker states no job counts or incentive agreement. Coordinates are the US Census geocoder's match for the Cedar St / N Larch St intersection named in the source; the parcel itself is not confirmed. Investment of $120 million and the 24 MW figure are both from the Gander tracker (as archived by the Internet Archive on 3 March 2026, a copy cited below; as of October 2026, the current version no longer lists the $120 million); the 24 MW also appears in the Lansing State Journal source.

Source describes a 16-megawatt fuel cell plant paired with the data center. The Lansing State Journal article describes the fuel cell facility as one that "generates energy from natural gas using chemical reactions rather than combustion", so the energy source is recorded as on-site natural gas.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.