Scarborough Technology Park (Scarborough High Technology Industrial Park) Data Center
Daniel Dickinson (landowner/developer) · Scarborough, ME · United States
Facility record
- Lifecycle
- ProposedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 43.5899737, -70.3346065
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- Not published
- Source record updated
- 2026-10-22
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- ProposedUnderlying source
Source notes
About 52 acres just west of the Maine Turnpike, owned by Daniel Dickinson since 2022. The master plan proposes a two-story building for contracted data processing. No street address, MW, or investment figure has been published. The pin is the Scarborough town centroid (OSM relation 12166255), not the parcel, so precision is approximate. The town manager says the application is not considered pending. A third-party tracker lists it as cancelled, but no withdrawal by the developer was found.
The master plan proposes natural gas-fed solid oxide fuel cells for power (Maine Public, 2026-05-06).
Sources and provenance
- Scarborough considers data center pause after development proposal · source retrieved 2026-10-22
- Scarborough to vote on data center moratorium · source retrieved 2026-10-22
- Brunswick, Scarborough enact data center moratoriums · source retrieved 2026-10-22