Duos Edge AI Columbus Campus

Duos Edge AI (Duos Technologies Group) · Columbus, GA · United States

Facility record

Lifecycle
OperationalSource-reported lifecycle
Location precision
approximate
Address as listed
8 Corporate Ridge Pkwy
Coordinates
32.461, -84.9877
Serving utility, source-reported
Not established
Operational capacity, source-reported
Not published
Planned capacity, source-reported
20 MW
Source record updated
2026-10-14

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Operational

    Inside the Datacenter lists 10 MW live at the Columbus site; initial 10 MW deployment expected to begin generating revenue August 2026

    Underlying source

Source notes

Duos raised $55M to acquire the Columbus facility. The first 10 MW was expected to begin generating revenue in August 2026. A five-year, $111M+ agreement with an unnamed investment-grade hyperscaler takes critical IT load to 20 MW by end of Q4 2026. An MSA with Nistar covers up to 2 MW. The street address is from an aggregator; coordinates are the Columbus city centroid.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.