- 33.0509477, -80.7911503
- Serving utility, source-reported
- Santee Cooper
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- 1000 MW
- Source record updated
- 2026-10-30
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Proposed
Eagle Rock Partners presented a single-user hyperscale campus (10 data centers, two substations, 1,000 MW, $6B) at a public information session. A development agreement is being finalized.
Underlying source
Source notes
A campus of more than 1,200 acres west of I-95 off Mount Carmel Road, inside Colleton County's new overlay district. Construction is expected around 2028-2029. The pin is an approximate point on the Mount Carmel Road segment west of I-95 (checked against I-95's OSM geometry), not the parcel. Same developer and the same 1,000 MW and $6B as Project Boulder (tracked in this dataset as of October 2026), but on a different parcel: Boulder was ~859 acres at Cooks Hill Road in the ACE Basin, and an Oct. 5, 2026 settlement places that tract in a Data Center Exclusion Area. The Post and Courier reported on October 7, 2026 that Eagle Rock Partners had abandoned the plan for the data center outside Walterboro and settled on a site in the northern reaches of Colleton County, within the new digital infrastructure overlay district.
Developer says it will pay for all off-site transmission. Construction timing depends on an energy and transmission study with Santee Cooper. Project leaders say it is not tied to the Canadys gas plant.
Sources and provenance
- New proposed Colleton County data center campus draws residents' questions · source retrieved 2026-10-27
- Colleton County residents raise concerns over proposed data center, power plant projects · source retrieved 2026-10-10
- OSM Nominatim: Mount Carmel Road, Colleton County (segment west of I-95, ZIP 29493) · source retrieved 2026-10-10
- Settlement protects sensitive ACE Basin from data center development in Colleton County (October 7, 2026) · source retrieved 2026-10-30
- Colleton County settles lawsuit, creating exclusion zone for data centers in ACE Basin (October 5, 2026) · source retrieved 2026-10-30
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.