SOURCE-LINKED U.S. REGISTRY

Rhodes Technology Park

Eagle Rock Partners · , SC · United States

Facility record

Lifecycle
ProposedSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
33.0509477, -80.7911503
Serving utility, source-reported
Santee Cooper
Operational capacity, source-reported
Not published
Planned capacity, source-reported
1000 MW
Source record updated
2026-10-30

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Proposed

    Eagle Rock Partners presented a single-user hyperscale campus (10 data centers, two substations, 1,000 MW, $6B) at a public information session. A development agreement is being finalized.

    Underlying source

Source notes

A campus of more than 1,200 acres west of I-95 off Mount Carmel Road, inside Colleton County's new overlay district. Construction is expected around 2028-2029. The pin is an approximate point on the Mount Carmel Road segment west of I-95 (checked against I-95's OSM geometry), not the parcel. Same developer and the same 1,000 MW and $6B as Project Boulder (tracked in this dataset as of October 2026), but on a different parcel: Boulder was ~859 acres at Cooks Hill Road in the ACE Basin, and an Oct. 5, 2026 settlement places that tract in a Data Center Exclusion Area. The Post and Courier reported on October 7, 2026 that Eagle Rock Partners had abandoned the plan for the data center outside Walterboro and settled on a site in the northern reaches of Colleton County, within the new digital infrastructure overlay district.

Developer says it will pay for all off-site transmission. Construction timing depends on an energy and transmission study with Santee Cooper. Project leaders say it is not tied to the Canadys gas plant.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.

Back to map & directory