eBay Topaz Data Center

eBay · South Jordan, UT · United States

Facility record

Lifecycle
OperationalSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
40.55849, -111.93671
Serving utility, source-reported
Not established
Operational capacity, source-reported
7.2 MW
Planned capacity, source-reported
Not published
Source record updated
2026-11-02

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

No dated operational history is established in this record. Publication, discovery and source-update dates are not opening dates.

Source notes

Subsidies checked at the municipal tier (2026-09-05): no site-level subsidy found. South Jordan's FY2024-25 tentative budget enumerates all 11 RDA/CDA/EDA project areas the city has ever run, active or completed, by name — none is eBay, Topaz, Daybreak, or Kennecott, and the completed pre-2008 areas predate the 2009-built Topaz campus. A separate 2022-adopted CRA (initially mislabeled "Daybreak Commerce Park" in a staff-report boilerplate paragraph, formally the Southwest Quadrant Urban Center Community Reinvestment Project Area) was checked and confirmed to be an unrelated greenfield transit-oriented project led by VP Daybreak Holdings/Larry H. Miller Company, not eBay. Historical state-level GOED EDTIF awards to eBay Inc. (2008 and 2011) are on the public record but are entity-level, not a South Jordan site agreement, and as of September 2026 their reported dollar figures could not be independently verified. Utah's EDTIF programme excludes data centres and the UCA 59-12-104 exemption is self-executing.

Data Center Knowledge reports '7.2 megawatts of capacity in phase 1, with a 30 megawatt substation on site' — the 30 MW is substation capacity for future phases, not IT load, so the recorded capacity is the 7.2 MW phase-1 figure. Efficiency features reported at opening: 400V power distribution, in-row cooling, hot air containment, and an expected PUE of 1.4. The building is LEED Gold certified.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.