York 2 Energy Center Data Center
Energy Capital Partners · Peach Bottom Township, PA · United States
Facility record
- Lifecycle
- ProposedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 39.75, -76.35
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- Not published
- Source record updated
- 2026-08-31
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Proposed
Announced by Energy Capital Partners at the Pennsylvania Energy and Innovation Summit; no formal land development plan filed with the township as of the August 2026 county survey.
Underlying source
Source notes
The 828 MW figure is the existing Calpine generating station's capacity, not the data center's IT load — no compute capacity has been published. The $5 billion is the announced site investment; the separately reported $90 billion figure is a statewide multi-company pledge and is not attributed here.
To be developed on the site of Calpine's York 2 Energy Center, an 828 MW dual-fuelled combined-cycle gas turbine station, giving direct access to on-site power. Calpine is an Energy Capital Partners subsidiary.
Sources and provenance
- $5B data center coming to York County energy site · source retrieved 2026-08-31
- Here's where data centers have been proposed or discussed in York County — and their status · source retrieved 2026-08-31
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.