York 2 Energy Center Data Center

Energy Capital Partners · Peach Bottom Township, PA · United States

Facility record

Lifecycle
ProposedSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
39.75, -76.35
Serving utility, source-reported
Not established
Operational capacity, source-reported
Not published
Planned capacity, source-reported
Not published
Source record updated
2026-08-31

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Proposed

    Announced by Energy Capital Partners at the Pennsylvania Energy and Innovation Summit; no formal land development plan filed with the township as of the August 2026 county survey.

    Underlying source

Source notes

The 828 MW figure is the existing Calpine generating station's capacity, not the data center's IT load — no compute capacity has been published. The $5 billion is the announced site investment; the separately reported $90 billion figure is a statewide multi-company pledge and is not attributed here.

To be developed on the site of Calpine's York 2 Energy Center, an 828 MW dual-fuelled combined-cycle gas turbine station, giving direct access to on-site power. Calpine is an Energy Capital Partners subsidiary.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.