Ashville Campus
EdgeConneX · Ashville, OH · United States
Facility record
- Lifecycle
- ProposedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 39.72, -83.03
- Serving utility, source-reported
- South Central Power Company
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- Not published
- Source record updated
- 2026-08-08
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- ProposedUnderlying source
Source notes
680 acres north of SR-752; 1.8GW substation plus a 200MW gas turbine energy center planned. Facing local opposition/criticism. The adjacent Ashville Energy Center (PowerConneX) OPSB filing now specifies up to 800 MW of generating capacity on ~110 acres, up from the 200 MW gas-turbine figure previously noted here — this is the power plant's nameplate generation, not a confirmed data-center IT load; at least one press aggregator miscalls this "the data center's capacity," but the primary OPSB filing does not support that reading.
Sources and provenance
- Proposed EdgeConneX data center in Pickaway County, Ohio facing criticism · source retrieved 2026-07-17
- HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage) · source retrieved 2026-07-23
- Public Info Meeting #1 — Ashville Energy Center · source retrieved 2026-08-08
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.