AUS02 / Cedar Creek Campus
EdgeConneX · Cedar Creek, TX · United States
Facility record
- Lifecycle
- Under constructionSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 30.139438, -97.565051
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- 384 MW
- Source record updated
- 2026-10-30
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Under construction
Building 1 (AUS02) nearing June 2026 completion.
Underlying source
Source notes
4-building campus, approximately 140 acres near Wolf Ln/FM 535.
Sources and provenance
- EdgeConneX plans second data center campus in Bastrop County · source retrieved 2026-07-17
- EdgeConneX data center update, May 2026 · source retrieved 2026-08-16
- Texas Department of Licensing and Regulation (TDLR) TABS project registration #TABS2025023484 — "ECX AUSTIN DFW33220N", owner DFW33220N LLC (EdgeConneX), address 8001 Wolf Ln Bldg 2 / 6752 FM 535, Cedar Creek, TX 78612 · source retrieved 2026-07-18
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.