SOURCE-LINKED U.S. REGISTRY

EdgeConneX CHI02

EdgeConneX · Elk Grove Village, IL · United States

Facility record

Lifecycle
OperationalSource-reported lifecycle
Location precision
exact
Address as listed
2021 Lunt Avenue
Coordinates
42.0014952, -87.9525624
Serving utility, source-reported
ComEd
Operational capacity, source-reported
7 MW
Planned capacity, source-reported
Not published
Source record updated
2026-10-15

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

No dated operational history is established in this record. Publication, discovery and source-update dates are not opening dates.

Source notes

Confirmed distinct from CHI01 (osm_id 174242795) on the same official page: CHI02 operational, 7MW N+1, 282,000 sq ft raised floor for tenants. AI/HPC (likely): EdgeConneX and Lambda announced a 23MW single-tenant liquid-cooled AI Factory on EdgeConneX's Chicago (Elk Grove Village) campus for high-density AI/HPC workloads.

EDCCHI02 is a specific, addressed EdgeConneX facility at 2021 Lunt Avenue, Elk Grove Village, IL — in ComEd territory, part of the Chicago-area cluster where ComEd has been actively expanding substation capacity (e.g., the Elk Grove substation expansion) to serve data-center load growth.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.

Back to map & directory