SOURCE-LINKED U.S. REGISTRY

EdgeCore Culpeper Data Center Campus

EdgeCore Digital Infrastructure · Culpeper, VA · United States

Facility record

Lifecycle
ProposedSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
38.4735, -77.96
Serving utility, source-reported
Rappahannock Electric Cooperative
Operational capacity, source-reported
Not published
Planned capacity, source-reported
216 MW
Source record updated
2026-08-27

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Proposed

    EdgeCore announced acquisition of 120 acres in the Culpeper Technology Zone for a 1.4 million sq ft campus, initially supporting 216 MW of critical IT load with potential expansion to 432 MW.

    Underlying source

Source notes

120 acres inside the 690-acre Culpeper Technology Zone, about 60 miles from Ashburn. The planned capacity records the initial 216 MW critical IT load; the 432 MW figure is a potential expansion, not a committed build. Distinct from the Red Ace Data Center in Culpeper County (different operator and site) and from EdgeCore's Shannon Hill campus in Louisa County, both tracked separately as of August 2026. Coordinates are an approximate geocode of the Culpeper Technology Zone.

Initial power delivery expected in early 2028.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.

Back to map & directory