EdgeCore Mesa Data Center Campus

EdgeCore Digital Infrastructure · Mesa, AZ · United States

Facility record

Lifecycle
OperationalSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
33.375, -111.6497
Serving utility, source-reported
Salt River Project (SRP)
Operational capacity, source-reported
206 MW
Planned capacity, source-reported
450 MW
Source record updated
2026-10-22

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Operational

    Initial campus operational; first $150M, 180,000 sq ft building serving hyperscale AI and cloud clients

  2. Under construction

    43.87-acre expansion adds three buildings, raising planned total to 450MW and 3.1M sq ft; PH02 topped out December 2024, expected fully operational 2026

    Underlying source
  3. Operational

    Campus returned to fully-operational status after the 2025 expansion phase: EdgeCore states it has "worked quickly to construct and commission 206 MW at the site" of a campus now planned for over 450 MW. The 206 MW is cumulative commissioned capacity across phases (the first building has been operational since 2023), not a single phase; remaining expansion buildings are still under construction.

    Underlying source

Source notes

Elliot Road Technology Corridor, Mesa. CEO stated 'Greater Phoenix is fast becoming the AI center of the West.' Expansion land purchase adds 43.87 acres to 40-acre original site. EdgeCore raised $2B equity and $2B debt in 2024. Coordinates approximate for Elliot Road corridor. Arizona's data-center sales/use-tax exemption (A.R.S. Sec. 41-1519) applies by statute, but no campus-specific certified award was publicly verifiable (eligibility != confirmed award); the $150M cited is first-building capex and the $2B equity + $2B debt EdgeCore raised in 2024 is corporate financing, not Mesa-campus capex.

Air-cooled closed-loop chilled water system; direct-to-chip liquid cooling available for high-density AI racks

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.