SOURCE-LINKED U.S. REGISTRY

Edged Chicago Campus — Aurora (ORD01)

Edged US · Aurora, IL · United States

Facility record

Lifecycle
Under constructionSource-reported lifecycle
Location precision
approximate
Address as listed
2835 Bilter Road
Coordinates
41.79, -88.284
Serving utility, source-reported
ComEd
Operational capacity, source-reported
Not published
Planned capacity, source-reported
72 MW
Source record updated
2026-10-22

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Operational

    First 24 MW building (ORD01-1) opened February 27, 2025

    Underlying source
  2. Under construction

    Groundbreaking for second AI-focused building November 2025; scheduled for Q2 2027 operational status

    Underlying source

Source notes

Address: 2835 Bilter Rd, Aurora IL (DuPage County). Total campus planned at 96 MW across three buildings. Explicitly purpose-built for high-density AI workloads. Coordinates approximate for Bilter Rd area of north Aurora; address confirmed in operator press release. A confirmed capex figure of ~$300M covers the first building (ORD01-1) only, not the ~96 MW three-building campus; construction-workforce figures (~2,000 full campus) are projections. No Illinois DCEO data-center exemption certification was found for Edged.

Grid-connected; proprietary waterless cooling eliminates cooling-related energy overhead

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.

Back to map & directory