Edged Council Bluffs Data Center Campus (Project Lola)

Edged Energy · Council Bluffs, IA · United States

Facility record

Lifecycle
Under constructionSource-reported lifecycle
Location precision
approximate
Address as listed
2801 College Road
Coordinates
41.278141, -95.7940246
Serving utility, source-reported
Not established
Operational capacity, source-reported
Not published
Planned capacity, source-reported
Not published
Source record updated
2026-09-04

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Under construction

    Two-building campus under construction on the east side of Council Bluffs off Kanesville Boulevard between Iowa Western Community College and I-80; completion planned for 2027.

    Underlying source

Source notes

Two buildings of 285,445 sq ft each (570,000 sq ft total) plus an administrative building. The plan was amended down from two 80-foot-tall halls totaling roughly 900,000 sq ft to 36-foot-3-inch buildings; the Council Bluffs city council approved the amendment unanimously. Reporting differs on power delivery — the amended plan is described both as requiring a MidAmerican Energy substation on site and as using two owner-operated substations plus a switchyard — so no utility or capacity value is recorded. Distinct from Edged's Ankeny facility already tracked.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.