Edged Dallas (Irving)
Edged Energy · Irving, TX · United States
Facility record
- Lifecycle
- OperationalSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- 505 North Wildwood Drive
- Coordinates
- 32.8211516, -96.9169508
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- 24 MW
- Planned capacity, source-reported
- Not published
- Source record updated
- 2026-10-28
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
No dated operational history is established in this record. Publication, discovery and source-update dates are not opening dates.
Source notes
Edged's April 2024 announcement says the facility at 505 N Wildwood Drive "will deliver 24 MW of critical capacity"; DataCenterNews US reported on 16 January 2026 that Edged US opened the first Edged Dallas facility in January 2025. The operator cites a portfolio-average PUE of 1.15 and a 74% reduction in energy overhead against a 1.58 global average. DataCenterNews US reported on 16 January 2026 that Irving City Council unanimously approved a second 24 MW building on the same campus, with groundbreaking expected in the second quarter of 2026; that expansion is not recorded here.
Sources and provenance
- Edged Continues North American Expansion with New, Ultra-Efficient, AI Ready Data Center in Irving, Texas · source retrieved 2026-08-26
- Edged gains approval for second waterless AI data centre · source retrieved 2026-10-28
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.