Edged DeKalb Campus (Project Vector)

Edged (Endeavour Energy) · DeKalb, IL · United States

Facility record

Lifecycle
PermittedSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
41.878256, -88.753784
Serving utility, source-reported
Not established
Operational capacity, source-reported
Not published
Planned capacity, source-reported
Not published
Source record updated
2026-09-25

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Permitted

    DeKalb City Council unanimously approved the annexation agreement, annexation, rezoning and concept plan for four data center buildings and two electrical substations on approximately 560 acres; city project list shows construction 2026-32.

    Underlying source

Source notes

Four data center buildings plus two electrical substations on both sides of Illinois Route 23, north of Keslinger Road and west of Crego Road, immediately south of Meta's DeKalb data center. Land is largely owned by ChicagoWest Business Center; petitioner of record is JJK 343 LLC. Coordinates are the IL-23 / Keslinger Road intersection (OSM), the site's southern edge, not a parcel centroid. No megawatt figure has been published.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.