Edged Prichard Data Center (Project Gateway)
Edged US · Prichard, AL · United States
Facility record
- Lifecycle
- ProposedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 30.7387998, -88.0788889
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- 8 MW
- Source record updated
- 2026-10-18
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
No dated operational history is established in this record. Publication, discovery and source-update dates are not opening dates.
Source notes
Developer site states verbatim: "8MW, 57,000 SF building – roughly the size of a football field", "$93 million investment in the local community", "150–200 construction jobs supported during an approximately 18-month construction period", "20 permanent full-time positions upon completion", and "Approximately $16.7 million in projected annual economic impact, including $8.3 million supporting local schools". The recorded construction jobs figure is the low end (150) of the stated 150-200 range rather than a midpoint. FOX10 adds the ~20 jobs pay "over $70,000 annually". Subsidy: no incentive or abatement is mentioned on the developer's project site or in FOX10's coverage; Prichard and Mobile County records had not been checked as of September 2026, so that is an unchecked gap, not an audited negative. The $16.7M annual economic impact and $8.3M schools figure are developer projections, not incentives, and are not recorded as subsidies. Status: the developer's own site calls the project "proposed" and "being evaluated"; no construction start is reported. Coordinates are the Prichard municipal centroid. WKRG reports that the developer wants to build on Telegraph Road, but no street address or parcel appeared in any source retrieved as of October 2026.
Sources and provenance
- Project Gateway | Sustainable Data Center Development in Prichard, AL (developer's project site) · source retrieved 2026-10-18
- Proposed data center in Prichard draws mixed reactions (1 June 2026) · source retrieved 2026-09-09
- Nominatim geocode of Prichard, Mobile County, Alabama (municipal centroid) · source retrieved 2026-09-09
- $93M proposed data center to bring 20 jobs to Prichard · source retrieved 2026-10-18
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.